The company was formerly a special engineering branch of Zhejiang Geotechnical Foundation Company. The branch was established in October 1996 and has been engaged in special professional engineering. In August 2012, Zhejiang Geotechnical Foundation Company began its enterprise transformation. The branch manager Jiang Wei led its key employees to establish Zhejiang Gubang Construction Special Technology Co., LTD. In September 2012. The company is the standing director unit of the Civil construction Professional Committee of China Old Professors Association, the deputy director unit of the building migration protection Professional Committee of China National Architecture Research Association, the vice president unit of the reinforcement branch of Zhejiang Building Decoration Industry Association, and the vice president unit of the appraisal branch of Ningbo Building Decoration Industry Association.
The core technical force of the company is composed of Zhejiang Province experts, Ningbo experts, members of China Old Professors Association, professor-level senior engineers, senior engineers and doctoral supervisors, and the technical force is thick. The existing backbone staff 65 people, the staff team is stable, rich experience.
The company mainly undertakes construction (structure) building foundation foundation reinforcement, structural reinforcement, construction (structure) building correction, translation, rotation, housing construction, ancient buildings, Bridges, integrated pipe corridors and other types of construction (structure) building replacement and transformation construction, housing safety dynamic monitoring, housing safety appraisal, underground layer, underground space development and other businesses.
In the past 25 years, we have rectified nearly two thousand projects of reinforcing, correcting and translating all kinds of building structures. Correction is a major feature of our company, a total of nearly a thousand house correction, including: nearly 100 building lifting correction (lifting correction record: one floor underground, 18 floors above the ground), high-rise (high-rise) building correction 25, pioneering the use of diamond rope saw for high-rise buildings crash landing correction.
Our company will, as always, regard quality and reputation as life, constantly forge ahead, and provide one-stop safe and reliable products and services for friends from all walks of life.
——High-tech enterprise